Skid Steer Snow Removal Rates
- Free
- No signup
- Sources cited
- In season now
A skid steer with a snow pusher is one of the most profitable machines in a snow fleet, but only if the hourly rate covers the machine as well as the operator. Check the market range, then build your own rate from payments, insurance, fuel and the hours you'll really bill this season.
What skid steer snow removal costs per hour
| Source | Skid steer with operator |
|---|---|
| Housecall Pro snow removal pricing guide | $100–$200/hr (loader or skid steer) |
| Contractor cost guides (LatestCost) | $125–$250/hr, often with a minimum charge |
| Lake County, MT snow plow contractor list | About $130–$230/hr |
| Town of Barnstable, MA rate sheet (public work, FY23) | About $95–$100/hr; public rates run below private commercial work |
The published private-market ranges above overlap at roughly $125–$200/hr. Larger machines, wider pushers and 24/7 storm availability justify the top of the range.
Build your skid steer hourly rate
The formula
- Machine cost per hour = (payments + insurance + maintenance + attachments) ÷ billable hours.
- Hourly cost = machine cost + operator pay + fuel (gallons per hour × diesel price).
- Break-even = hourly cost × (1 + overhead %).
- Suggested rate = break-even ÷ (1 − profit margin %).
The biggest lever is billable hours. A machine that only works 100 hours in a light winter has twice the machine cost per hour of one that works 200. That's why many contractors pair hourly work with seasonal contracts that guarantee income, and set a minimum call-out so a 30-minute job still covers trailering and setup.
Hourly vs. per push for skid steer work
Hourly (time and materials) suits large lots, stacking and relocating piles, and storms that run unpredictably long. Per push or per event pricing suits regular commercial accounts where you know the site. A skid steer with a pusher box clears open lots much faster than a pickup because there are no back-up passes, so per-push pricing rewards an efficient operator. To bid lots per acre, use our commercial snow plowing calculator.
Attachments and what they mean for pricing
| Attachment | Best for | Pricing note |
|---|---|---|
| Snow pusher (containment box) | Open lots, fast pushing | Highest productivity; 8 ft pushers need a machine of roughly 40+ hp and 10 ft about 70+ hp |
| Bucket | Stacking, loading trucks | Slow for clearing but essential for piles; bill hauling separately |
| Angle or V-blade | Roads, drives, windrowing | Versatile; productivity between bucket and pusher |
| Snowblower | Deep snow, tight areas, throwing over banks | Slower but solves problems; price at the top of your range |
Frequently asked questions
How much should I charge per hour for skid steer snow removal?
Published rates for a skid steer with operator commonly run about $100–$250 per hour, and the published ranges overlap at roughly $125–$200. Build your own rate from machine costs, fuel, operator pay and realistic billable hours, then compare it to your local market.
Is there a minimum charge for skid steer snow removal?
Most contractors set one, often as a minimum number of billed hours per call-out, because trailering, setup and travel take time even on short jobs.
Is a skid steer better than a plow truck for snow removal?
For open parking lots, a skid steer with a pusher is usually faster because it doesn't need back-up passes, and it can stack snow. A plow truck is better for moving quickly between many small sites. Many contractors run both.
Should I charge extra for hauling or relocating snow?
Yes. Loading and hauling snow off site takes extra equipment and trucks. It's usually billed separately, either hourly or per load.
Sources: Housecall Pro, LatestCost, Lake County MT contractor list, Town of Barnstable rate sheet, Compact Equipment, Construction Equipment Guide. Machine-cost defaults are illustrative; use your own numbers.